New Build Construction in Clare
Compare up to 4 new build construction professionals in Clare. Free, no obligation.
Clare ranges from the Ennis urban area (with 1970s-2000s estates) to the Burren's unique limestone landscape and the Atlantic coastline. Shannon Town has specific housing stock built for the airport and industrial zone. Ennis has a mix of older town-centre properties and modern suburban estates. The west Clare coast (Lahinch, Kilkee, Spanish Point) has a significant holiday home market. Rural Clare has traditional farmhouses and self-builds.
Clare receives moderate to high rainfall (1,000-1,400mm), increasing toward the Atlantic coast. The Burren area has unique drainage characteristics with limestone karst geology. Coastal exposure is significant along the west coast and Loop Head. Shannon estuary properties face specific wind and flood considerations. The relatively mild climate supports year-round construction work.
New Build Construction in Clare: Local Insights
Clare ranges from the Ennis urban area (with 1970s-2000s estates) to the Burren's unique limestone landscape and the Atlantic coastline. Shannon Town has specific housing stock built for the airport and industrial zone. Ennis has a mix of older town-centre properties and modern suburban estates. The west Clare coast (Lahinch, Kilkee, Spanish Point) has a significant holiday home market. Rural Clare has traditional farmhouses and self-builds.
Clare receives moderate to high rainfall (1,000-1,400mm), increasing toward the Atlantic coast. The Burren area has unique drainage characteristics with limestone karst geology. Coastal exposure is significant along the west coast and Loop Head. Shannon estuary properties face specific wind and flood considerations. The relatively mild climate supports year-round construction work.
Ennis is Clare's main market, with moderate demand for home services. The Wild Atlantic Way tourism route drives holiday property maintenance. Shannon's industrial zone supports professional demand. Clare County Council manages planning. The Burren and Cliffs of Moher area has specific environmental and heritage planning restrictions.
New Build Construction Costs in Clare
Typical costs for new build construction in Clare (prices may vary ):
| Service | Typical Cost | Notes |
|---|---|---|
| Standard 3-bed bungalow | €200,000 | €320,000 | Location, specification, site conditions |
| 4-bed two-storey house | €280,000 | €450,000 | Size, design, finish level |
| High-spec A-rated home | €350,000 | €550,000 | Energy rating target, custom features |
Build costs depend on six main factors: location (Dublin is 20-30% above national average), house size and design complexity, specification level (standard vs premium finishes), site conditions (rock, high water table, poor access add cost), energy performance target (Passive House or A1 costs more than B2), and the current construction market (labour shortages push prices up). Professional fees (architect, engineer, quantity surveyor, assigned certifier) add 10-15% to the build cost. Site development (connection to services, drainage, driveway, landscaping) adds another €20,000 to €50,000 depending on the site.
Areas We Cover in Clare
New Build Construction FAQs for Clare
Building costs range from €1,800 to €3,500 per square metre. A three-bedroom bungalow (130 m²) costs approximately €230,000 to €380,000. A four-bedroom two-storey house (200 m²) costs €360,000 to €550,000. These figures cover the build only, not the site, professional fees (10-15% of build cost), site development, or connection charges. Dublin and commuter county builds cost 20-30% more than the national average.
From breaking ground to moving in, a standard self-build takes 10 to 14 months. Planning permission takes 8 to 12 weeks. Detailed design and tendering take 2 to 4 months. The total timeline from first engaging an architect to moving in is typically 18 to 24 months. Timber frame builds are faster (8 to 10 months on site) because the frame arrives pre-manufactured. Weather delays, material shortages, and subcontractor scheduling can all extend timelines.
Yes, for all practical purposes. While there is no legal requirement to use an architect, the planning, building regulations, BCMS certification, and design complexity of a new house make professional design essential. Under the BCMS system, a qualified architect or building surveyor must be appointed as the assigned certifier who takes statutory responsibility for inspecting the build and certifying compliance. An experienced architect also ensures your home is well-designed, energy-efficient, and maximises the potential of your site.
The Building Control Management System requires that a Commencement Notice be submitted at least 28 days before work starts. For new houses, this must be a statutory commencement notice signed by an assigned certifier (architect or building surveyor) and a design certifier (engineer). The assigned certifier carries out inspections during construction and issues a Certificate of Compliance on Completion when the build is finished. This certificate is required for occupancy and is checked by solicitors during any future sale.
Both systems are well-established in Ireland. Block build (concrete block walls) is traditional, slightly cheaper, and familiar to most Irish builders. Timber frame is faster (the shell is erected in days, not months), provides superior insulation, and is the standard approach for energy-efficient and Passive House builds. Timber frame costs 5-10% more overall but the faster build time can offset this. Many modern Irish homes use a hybrid approach with timber frame walls and block internal walls. Your architect should advise based on your design and energy targets.
Building regulations require new homes to achieve a BER rating of A2 or better. Targeting A1 or even Passive House standard costs 5-15% more but delivers significantly lower running costs and superior comfort. An A1 home costs approximately €200 to €500 per year to heat, compared to €800 to €1,200 for an A3 home. Given that you are building from scratch, investing in the highest energy performance you can afford is almost always worth it.